South Lafourche Levee District
Installation
Installation
Pre-planted Matrix Strips Installed
6 months post installation
Root growth at 6 months
9 Months post Installation
9 month Growth
New Smooth Cord shoots at 16 months
Vegetation breaking a wave
Overview
Eco Matrix with pre-planted matrix strips was installed along a continually eroding levee base. Annual maintenance of the levee was is necessary due to erosion occurring from daily wave energies. The goal of this project was to see if planted vegetation would survive and grow at the water’s edge, thus buffering the levee from further erosion.
Results
Vegetation quickly established and spread, ultimately covering the entire Eco Matrix. After only nine months there were approximately three feet of vegetation at the levee base working as a buffer to protect the levee from daily wave energies.
- Location
- Golden Meadow, Louisiana
- Solution
- Eco Matrix
- Project Type
-
Land Restoration
- Install Date
- September 2010
- Project Size
- 1000 linear feet
- SPECIES PLANTED
- Smooth Cord and Seashore Paspalum